Research Article

31 March 2024. pp. 22-29
Abstract
References
1
Aibinu, A. A., Carter, S., Francis, V., Vaz-Serra, P. (2020). Request for Information Frequency and Their Turnaround Time in Construction Projects: A Data-analytic Study, Built Environment Project and Asset Management, 10(1), pp. 1-15. 10.1108/BEPAM-10-2018-0130
2
Baghalzadeh Shishehgarkhaneh, M., Keivani, A., Moehler, R. C., Jelodari, N., Roshdi Laleh, S. (2022). Internet of Things (IoT), Building Information Modeling (BIM), and Digital Twin (DT) in Construction Industry: A Review, Bibliometric, and Network Analysis. Buildings, 12(10), 1503. 10.3390/buildings12101503
3
Bryde, D., Broquetas, M., Volm, J. M. (2013). The Project Benefits of Building Information Modelling (BIM), International Journal of Project Management, 31(7), pp. 971-980. 10.1016/j.ijproman.2012.12.001
4
Chen, L., Luo, H. (2014). A BIM-based Construction Quality Management Model and Its Applications, Automation in Construction, 46, pp. 64-73. 10.1016/j.autcon.2014.05.009
5
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., McNiff, S. (2013). BIM Implementation Throughout the UK Construction Project Lifecycle: An Analysis, Automation in Construction, 36, pp. 145-151. 10.1016/j.autcon.2013.09.001
6
Ham, N. H., Yuh, O. K. (2023). Performance Analysis and Assessment of BIM-based Construction Support with Priority Queuing Policy, Buildings, 13(1), 153. 10.3390/buildings13010153
7
Ham, N., Moon, S., Kim, J. H., Kim, J. J. (2020). Optimal BIM Staffing in Construction Projects Using a Queueing Model, Automation in Construction, 113, 103123. 10.1016/j.autcon.2020.103123
8
Higgins Jr, D., Fryer, S. (2013). Using the Forward Thinking Index to Measure Request for Information Submission Effectiveness. 49th ASC Annual International Conference Proceedings, San Luis Obispo, CA., pp. 10-13.
9
Huh, S. H., Ham, N., Kim, J. H., Kim, J. J. (2023). Quantitative Impact Analysis of Priority Policy Applied to BIM-based Design Validation, Automation in Construction, 154, 105031. 10.1016/j.autcon.2023.105031
10
Kim, D. S., Choi, H. M., Kim, J. H. (2014). A Proposal of BIM Work Process to Support Construct-ability Analysis from Practitioners Viewpoint, Journal of the Korea Institute of Building Construction, 14(6), pp. 561-569. 10.5345/JKIBC.2014.14.6.561
11
Kim, H. J., Yoo, M. Y., Kim J. J., Choi, C. S. (2017). Performance Analysis of BIM Labor Using Case Analysis, Journal of the Korea Institute of Building Construction, 7(3), pp. 31-39.
12
Kim, H. S. (2010). Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies, Construction, 54(1), pp. 65-69.
13
Kim, M. K, Kang, C., Koh, I, L. (2022). A Basic Study on Establishing Information System of Each Stage to Adopt the Current Architecture Process Based BIM -Focusing on the Drawing and Form Composition Information-, Journal of the Korea Academia-Industrial Cooperation Society, 23(4), pp. 531-540. 10.5762/KAIS.2022.23.4.531
14
Kim, W. J., Park, J. H., Cha, Y, O., Hyun, C, T., Han, S, W. (2016). Development of Checklist for BIM Model Requirements in Construction Phase, Korean Journal of Construction Engineering and Management, 20(1), pp. 22-31.
15
Lau, S. E. N., Zakaria, R., Aminudin, E., Saar, C. C., Yusof, A., Wahid, C. M. F. H. C. (2018). A Review of Application Building Information Modeling (BIM) During Pre-construction Stage: Retrospective and Future Directions, IOP Conference Series: Earth and Environmental Science, 143(1), 012050. 10.1088/1755-1315/143/1/012050
16
Lee, G., Park, H. K., Won, J. (2012). D3 City Project-Economic Impact of BIM-assisted Design Validation, Automation in Construction, 22, pp. 577-586. 10.1016/j.autcon.2011.12.003
17
Li, X., Xu, J., Zhang, Q. (2017). Research on Construction Schedule Management Based on BIM Technology, Procedia Engineering, 174, pp. 657-667. 10.1016/j.proeng.2017.01.214
18
Liu, Z., Osmani, M., Demian, P., Baldwin, A. (2015). A BIM-aided Construction Waste Minimisation Framework, Automation in Construction, 59, pp. 1-23. 10.1016/j.autcon.2015.07.020
19
Messner, J. (2023). BIM Project Execution Planning Guide, Vesion 3.0. Penn State Computer Integrated Construction Research Program. https://psu.pb.unizin.org/bimprojectexecutionplanning/.
20
Morales, F., Herrera, R. F., Rivera, F. M. L., Atencio, E., Nunez, M. (2022). Potential Application of BIM in RFI in Building Projects, Buildings, 12(2), 145. 10.3390/buildings12020145
21
Parsamehr, M., Perera, U. S., Dodanwala, T. C., Perera, P., Ruparathna, R. (2023). A Review of Construction Management Challenges and BIM-based Solutions: Perspectives from the Schedule, Cost, Quality, and Safety Management, Asian Journal of Civil Engineering, 24(1), pp. 353-389. 10.1007/s42107-022-00501-4
22
Sompolgrunk, A., Banihashemi, S., Mohandes, S. R. (2023). Building Information Modelling (BIM) and the Return on Investment: A Systematic Analysis, Construction Innovation, 23(1), pp. 129-154. 10.1108/CI-06-2021-0119
23
Sulankivi, K., Kahkonen, K., Makela, T., Kiviniemi, M. (2010). 4D-BIM for Construction Safety Planning, Proceedings of W099-special Track 18th CIB World Building Congress, 2010, pp. 117-128.
24
Toyin, J. O., Mewomo, M. C. (2022). Overview of BIM Contributions in the Construction Phase: Review and Bibliometric Analysis, Journal of Information Technology in Construction, 28, pp. 500-514. 10.36680/j.itcon.2023.025
25
Walasek, D., Barszcz, A. (2017). Analysis of the Adoption Rate of Building Information Modeling [BIM] and its Return on Investment [ROI], Procedia Engineering, 172, pp. 1227-1234. 10.1016/j.proeng.2017.02.144
26
Wanberg, J., Harper, C., Hallowell, M. R., Rajendran, S. (2013). Relationship between Construction Safety and Quality Performance, Journal of Construction Engineering and Management, 139(10), 04013003. 10.1061/(ASCE)CO.1943-7862.0000732
27
Whitlock, K., Abanda, F. H., Manjia, M. B., Pettang, C., Nkeng, G. E. (2018). BIM for Construction Site Logistics Management, Journal of Engineering, Project, and Production Management, 8(1), 47. 10.32738/JEPPM.201801.0006
28
Won, J., Lee, G. (2016). How to Tell if a BIM Project is Successful: A Goal-driven Approach, Automation in Construction, 69, pp. 34-43. 10.1016/j.autcon.2016.05.022
29
Yoon, S, W., Kim, S, A., Choi, J, M., Kem, D, Y. (2015). A Proposal for Using BIM Model Created in Design to Construction Phase - Case Study on Preconstruction Adopting BIM -, Journal of Korean Institute of BIM, 5(4), pp. 1-10. 10.13161/kibim.2015.5.4.001
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 14
  • No :1
  • Pages :22-29
  • Received Date : 2023-12-21; 2024-03-04
  • Accepted Date : 2024-03-07