All Issue

2023 Vol.13, Issue 4 Preview Page

Research Article

31 December 2023. pp. 85-95
Abstract
References
1
Architecture & Urban Research Institute (2020). Architectural Service Industry Trends and Issues, p. 24.
2
Cha. J. H., Choi. J. S., Bae. Y. S., Woo. Y. W. (2020). An Optimization Method of Spatial Placement for Effective Vehicle Loading, Journal of the Korea Institute of Information and Communication Engineering, 24(2), pp. 186-191.
3
Chang. D. K., Park. J. H. (2022). The Multi-objective Optimization Using Evolutionary Algorithm to Design Architectural Layouts, Journal of the Architectural Institute of Korea, 38(11), pp. 37-48.
4
Choi, M., Lee, K., Cho. T. (2004). Application of Expert System to Automatic Dimension Marking on Design Drawing, Journal of the Korea Society for Simulation, 13(4), pp. 31-42.
5
Han. S. N., Lee. K. Y., Roh. M. L. (2001). A Study on the Optimal Facility Layout Design Using an Improved Genetic Algorithm, Transactions of the Society of CAD/CAM Engineers, 6(3), pp. 174-183.
6
Heo. W. J. (2017). A Study on the Acceleration of an Overlap Avoidance Algorithm in Pipe Installation Drawing Using GPU, Master Thesis, Naval Architecture and Ocean Engineering, Chungnam National University.
7
Hwang, I., Ruy, W., Park, I., Park, J. (2016). Application of Overlap Avoidance to Augment the Production Data in Pipe Installation Drawings, Journal of the Society of Naval Architects of Korea, 53(5), pp. 428-434. 10.3744/SNAK.2016.53.5.428
8
Kim. Y. G., Park. K. (2022). Rule Based Facility Layout Optimization Using PSO Algorithm, The Korean Society of Mechanical Engineers Spring and Autumn Conference, 2022(5), p. 63.
9
Malysh, K. (2020). Optimization of 2D Drawings in Architectural Engineering and Construction, Masters Thesis, Information Technology, Tampere University.
10
Mangal. M., Li. M., Gan. V. J. L., Cheng. J. C. P. (2021). Automated Clash-free Optimization of Steel Reinforcement in RC Frame Structures Using Building Information Modeling and Two-stage Genetic Algorithm, Automation in Construction, 126(2021), 103676. 10.1016/j.autcon.2021.103676
11
Ministry of Land, Infrastructure, and Transport (2021). BIM-based Construction Industry Digital Transformation Roadmap.
12
Ministry of Land, Infrastructure, and Transport (2022). Smart Construction Activation Plan S-Consturciton 2030.
13
Park. S. E (2023). A Study on Securing Productivity Through Quantitative Analysis of Log Data-Based BIM Drawing Generation Process, Master Thesis, Sungkyunkwan University.
14
Ruy, W., Yang, Y., Yun, Y., Ko, D. (2009). Overlap-Avoidance Algorithm for Automation of Drawing Generation, Journal of the Society of Naval Architects of Korea, 46(6), pp. 622-630. 10.3744/SNAK.2009.46.6.622
15
Shin. J. H. (2023). Development of Interference Detection and Rearrangement Algorithm for BIM Drawing Annotation Objects, Master Thesis, Global Smart City, Sungkyunkwan University.
16
Zhao, Z. B., Niu, Q. Z. (2014). The Research and Implementation of Autodimension in Engineering Drawing based on Pro/E. Applied Mechanics and Materials, 610, pp. 615-619. 10.4028/www.scientific.net/AMM.610.615
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 13
  • No :4
  • Pages :85-95
  • Received Date : 2023-11-20; 2023-11-29
  • Accepted Date : 2023-12-11