All Issue

2022 Vol.12, Issue 4
31 December 2022. pp. 1-18
Abstract
References
1
Chen, H., Hou, L., Zhang, G. (Kevin), Moon, S. (2021). Development of BIM, IoT and AR/VR technologies for fire safety and upskilling. Automation in Construction, 125(January), 103631. 10.1016/j.autcon.2021.103631
2
Chen, K., Chen, W., Cheng, J. C. P., Wang, Q. (2020). Developing Efficient Mechanisms for BIM-to-AR / VR Data Transfer. 1(c), pp. 1-16. 10.1061/(ASCE)CP.1943-5487.0000914
3
Choi, S,, Park, J,, Lee J., Park, I., Choi, D,. (2019). Development of Augmented Reality System for Productivity Enhancement in Offshore Plant Constructiontle. SAMSUNG Best Paper Award.
4
Davila Delgado, J. M., Oyedele, L., Demian, P., Beach, T. (2020). A research agenda for augmented and virtual reality in architecture, engineering and construction. Advanced Engineering Informatics, 45(April), 101122. 10.1016/j.aei.2020.101122
5
Dayton, E., Henriksen, K. (2007). Communication failure: Basic components, contributing factors, and the call for structure. Joint Commission Journal on Quality and Patient Safety, 33(1), pp. 34-47. 10.1016/S1553-7250(07)33005-5
6
Eklundh, K. S. (1988). Explicit and Implicit Feedback in Computer-Mediated Communication. Applications of Distributed Systems, pp. 147-153. 10.1016/0169-7552(87)90049-3
7
Fernández del Amo, I., Erkoyuncu, J. A., Roy, R., Palmarini, R., Onoufriou, D. (2018). A systematic review of Augmented Reality content-related techniques for knowledge transfer in maintenance applications. Computers in Industry, 103, pp. 47-71. 10.1016/j.compind.2018.08.007
8
Garbett, J., Hartley, T., Heesom, D. (2021). A multi-user collaborative BIM-AR system to support design and construction. In Automation in Construction 122(Issue Mvc). 10.1016/j.autcon.2020.103487
9
Hull, E., Jackson, K., Dick, J. (2011). Requirements Engineering. 10.1007/978-1-84996-405-0
10
Lee, S., Alzoubi, H. H., Kim, S. (2017). The effect of interior design elements and lighting layouts on prospective occupants’ perceptions of amenity and efficiency in living rooms. Sustainability, 9(7). 10.3390/su9071119
11
Penate-Sanchez, A., Andrade-Cetto, J., Moreno-Noguer, F. (2013). Exhaustive Linearization for Robust Camera Pose and Focal Length Estimation. IEEE Transactions on Pattern Analysis and Machine Intelligence, 35(10), pp. 2387-2400. 10.1109/TPAMI.2013.3623969384
12
Schiavi, B., Havard, V., Beddiar, K., Baudry, D. (2022). BIM data flow architecture with AR/VR technologies: Use cases in architecture, engineering and construction. Automation in Construction, 134(October 2021), 104054. 10.1016/j.autcon.2021.104054
13
Sidani, A., Matoseiro Dinis, F., Duarte, J., Sanhudo, L., Calvetti, D., Santos Baptista, J., Poças Martins, J., Soeiro, A. (2021). Recent tools and techniques of BIM-Based Augmented Reality: A systematic review. Journal of Building Engineering, 42(March). 10.1016/j.jobe.2021.102500
14
Singh, V., Gu, N., Wang, X. (2011). A theoretical framework of a BIM-based multi-disciplinary collaboration platform. Automation in Construction, 20(2), pp. 134-144. 10.1016/j.autcon.2010.09.011
15
Steffen, J. H., Gaskin, J. E., Meservy, T. O., Jenkins, J. L., Wolman, I. (2019). Framework of Affordances for Virtual Reality and Augmented Reality. Journal of Management Information Systems, 36(3), pp. 683-729. 10.1080/07421222.2019.1628877
16
Wildenauer, A. A. (2020). Critical Assessment of the Existing Definitions of Bim Dimensions on the Example of Switzerlan. International Journal of Civil Engineering and Technology (Ijciet), 11(4). 10.34218/IJCIET.11.4.2020.012
17
Zhou, Y., Luo, H., Yang, Y. (2017). Implementation of augmented reality for segment displacement inspection during tunneling construction. Automation in Construction, 82, pp. 112-121. 10.1016/j.autcon.2017.02.007
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 12
  • No :4
  • Pages :1-18
  • Received Date : 2022-05-30
  • Revised Date : 2022-11-02
  • Accepted Date : 2022-11-28