30 September 2024. pp. 13-21
Abstract
References
1

Cha, Y. N., Kim, S. A., Chin, S. Y. (2014). Analysis of Quantity Take-Off Accuracy Using BIM-Based Spatial Objects, KIBIM Magazine, 4(4), pp. 13-23.

10.13161/kibim.2014.4.4.013
2

Eom, J. E., Lee, J. H., Kim, J. H., Choe, I. S. (2014). Introduction of BIM-bAsed Rebar Modeling Automation System, Journal of Computational Structural Engineering, 27(3), pp. 18-24.

3

Ergen, F., Bettemir, Ö. H. (2022). Development of BIM Software with Quantity Take-Off and Visualization Capabilities, Journal of Construction Engineering, Management & Innovation, 5(1), pp. 01-14.

10.31462/jcemi.2022.01001014
4

Jang, J. W. (2013). Development of Rebar Arrangement System for Reinforced Concrete Foundation Using Lean Design Technique based on Structural BIM, Masters Thesis, Hanyang University Graduate School, pp. 45-46.

5

Joo, S. W., Kim, C. K., Kim, S. W., Noh, J. O. (2017). Establishment of BIM-Based Quantity and Cost Estimation Guidelines for Reinforced Concrete Frames, Journal of the Computational Structural Engineering Institute of Korea, 30(6), pp. 567-576.

10.7734/COSEIK.2017.30.6.567
6

Jung, J. H., Kim, C. K., Lee, J. C., Kim, J. H., Kim, M. S. (2012). Representation of Rebar Using IFC at Schematic Structural Design Stage, Journal of the Architectural Institute of Korea: Structure, 28(1), pp. 59-67.

7

Kim, S. A., Park, G., Song, B. S., Choi, C. H., Chin, S. Y. (2016). Study on the Creation of Work Environment for Improving Productivity of BIM Estimation Tasks, Journal of the Korea Institute of Construction Engineering and Management, 17(1), pp. 56-65.

10.6106/KJCEM.2016.17.1.056
8

Kim, S. H., Kim, S. G., Seo, S. W., Kim, S. C. (2023). Development of Automated Algorithm for Slab Rebar Quantity Calculation, Journal of the Korea Institute of Construction Engineering and Management, 24(5), pp. 52-62.

9

Kim, Y. J., Kim, S. A., Chin, S. Y. (2012). A study on Improving the Reliability of BIM-Based Estimation Modeling Data, Journal of the Korea Institute of Construction Engineering and Management, 13(3), pp. 43-55.

10.6106/KJCEM.2012.13.3.043
10

Kusumaningroem, T. T., Gondokusumo, O. (2023). Comparison of Building Information Modeling and Conventional Methods for Concrete and rebar Quantity Take-Off, International Journal of Application on Sciences, Technology and Engineering, 1(2), pp. 674-684.

10.24912/ijaste.v1.i2.674-684
11

Lee, J. C. (2019). Efficient Rebar Quantity Calculation in the Early Design Stage Using BIM models, Journal of the Architectural Institute of Korea: Structure, 35(5), pp. 145-152.

12

Porwal, A., Hewage, K. N. (2011). Building Information Modeling-Based Analysis to Minimize Waste Rate of Structural Reinforcement, Journal of Construction Engineering and Management, 138(8), pp. 943-954.

10.1061/(ASCE)CO.1943-7862.0000508
13

Seo, H. S. (2014). A Study on the Application of Rebar Quantity Calculation and Construction Detailing Using 3D Modeling Technique, Masters Thesis, Seoul National University of Science and Technology Graduate School of Industry, p. 62.

14

Seong, J. G. (2012). Design and Development of BIM Based Rebar Shop Drawing System for Column and Wall, Masters Thesis, Daejeon University, pp. 76-79.

15

Sherafat, B., Taghaddos, H., Shafaghat, E. (2022). Enhanced Automated Quantity Take-Off in Building Information Modeling, Scientia Iranica A: Civil Engineering, 29(3), pp. 1024-1037.

16

Song, C. H., Kim, C. K., Lee, S. E., Choi, H. C. (2016). Establishment of BIM-Based Rebar Quantity Calculation Process in the Early Design Stage, Journal of the Computational Structural Engineering Institute of Korea, 29(5), pp. 447-454.

10.7734/COSEIK.2016.29.5.447
17

Ugochukwu, S. C., Nwobu, E. A., Udechukwu-Ukohah, E. I., Odenigbo, O. G., Ekweozor, E. C. (2020). Regression Models for Predicting Quantities and Estimates of Steel Reinforcements in Concrete Beams of Frame Buildings, Journal of Scientific Research & Reports, 26(7), pp. 60-74.

18

Yun, J. D., Cho, H. S., Lee, J. H., Shin, J. Y., Kim, E. S. (2020). Comparison of Rebar Quantity Calculation in Reinforced Concrete Structures based on BIM, Journal of the Computational Structural Engineering Institute of Korea, 33(1), pp. 35-44.

10.7734/COSEIK.2020.33.1.35
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 14
  • No :3
  • Pages :13-21
  • Received Date : 2024-08-21; 2024-08-28
  • Accepted Date : 2024-08-29