All Issue

2022 Vol.12, Issue 4 Preview Page
31 December 2022. pp. 41-51
Abstract
References
1
Bughin, J., Manyika, J., Woetzel, J. (2017). REINVENTING CONSTRUCTION: A ROUTE TO HIGHER PRODUCTIVITY, MacKinsey Global Institute, pp. 57.
2
Choi, H. L., Jang, K. S., Kim, H., Lee, M. H., Park, M. S. (2019). Algorithm-based Railway Tunnel BIM Design Considering Railway Alignment, Journal of Korean Institute of Building Information Modeling, 9(1), pp. 1-10.
3
Hong, G. H. (2018). Analysis and Solution of Direct Light Risk at Tunnel Exit Using 3D Solar Simulation Technique, Magazine of korean Tunnelling and Underground Space Association, 20(2), pp. 29-37.
4
Honsberg, C., Bowden, S., (2016). PV CDROM (Yoon, K. H. Trans.), Korea Institute of Energy Research, pp. 31-40.
5
Jeong, J. W., Seo, J. H., Choo, S. Y., (2018). A Study on the Application of BIM-based Dynamo Algorithm for Automated Quantity Calculation in Construction Stage, Journal of the Korean housing association, 30(1), pp. 173-176.
6
Kim, C. Y., Moon, H. S., Nah, H. S., Kim, J. Uk. (2014). Case study of Civil Engineering BIM Projects : Perspective of Korean Public Owners, Journal of the Korea Academia-Industrial cooperation Society, 15(12), pp. 7430-7437. 10.5762/KAIS.2014.15.12.7430
7
Kim, Y. R., KIM, S. Y., Choi, J. S., Lee, D. S. (2012). Study for Influence of Sun Glare Effect on Traffic Safety at Tunnel Hood, International Journal of Highway Engineering, pp. 103-110. 10.7855/IJHE.2012.14.6.103
8
Koo, B. S., Ok, H., Yu, Y. S., Jung, R. K. (2018). Analysis of Singapore’s BIM tender documents for the development f infrastructure BIM guidelines in Korea, Journal of Korean Institute of Building Information Modeling, 8(2), pp. 19-28.
9
Korea Expressway Corporation. (2014). 2013 Highway Design Workbook, Korea Expressway Corporation, pp. 410-417.
10
Lee, S. B., Jang, M. S., Doh, T. W., Kim, W. C. (2001). Effects of Human Factors on Road Design (Stage 1), The Korea Transport Institute, pp. 18-19.
11
MOLIT. (2020). Basic Guidelines for BIM in Construction Industry, Ministry of Land, Infrastructure and Transport, pp. 18-21.
12
National Geographic Information institute. (2020). Public Survey Work Regulations, https://www.law.go.kr (Sep. 14. 2022)
13
Oh, K. S., Park, S. H., Song, J. W. (2016). A Study on the Using of BIM Data and Template for Construction Progress Management, Journal of the Korea Academia-Industrial cooperation Society, 17(8), pp. 157-163. 10.5762/KAIS.2016.17.8.157
14
Raza, H., Park, S. I., Lee, S. S., Tanoli, W. A., Seo, J. W. (2017). 3D Earthwork BIM Design Process for a Road Project, Journal of Korean Institute of Building Information Modeling, 7(2), pp. 8-15.
15
Song, S. L., Lee, H. S. (2020). Development of Point Layout Algorithm Using BIM-based Dynamo, Journal of the Korean Institute of Interior Design, 29(3), pp. 167-174. 10.14774/JKIID.2020.29.3.167
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 12
  • No :4
  • Pages :41-51
  • Received Date : 2022-07-25
  • Revised Date : 2022-09-27
  • Accepted Date : 2022-11-11