All Issue

2022 Vol.12, Issue 4 Preview Page
31 December 2022. pp. 61-69
Abstract
References
1
Abdelmegid, M. A., González, V. A., Poshdar, M., O’Sullivan, M., Walker, C. G., Ying, F. (2020). Barriers to adopting simulation modelling in construction industry. Automation in construction, 111, p. 103046. 10.1016/j.autcon.2019.103046
2
Abioye, S. O., Oyedele, L. O., Akanbi, L., Ajayi, A., Delgado, J. M. D., Bilal, M., Ahmed, A. (2021). Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges. Journal of Building Engineering, 44, p. 103299. 10.1016/j.jobe.2021.103299
3
Akhavian, R., Behzadan, A. H. (2012). An integrated data collection and analysis framework for remote monitoring and planning of construction operations. Advanced Engineering Informatics, 26(4), pp. 749-761. 10.1016/j.aei.2012.04.004
4
Akhavian, R., Behzadan, A. H. (2014). Evaluation of queuing systems for knowledge-based simulation of construction processes. Automation in Construction, 47, pp. 37-49. 10.1016/j.autcon.2014.07.007
5
Alshibani, A., Moselhi, O. (2007). Tracking and forecasting performance of earthmoving operations using GPS data. In CME 25 Conference Construction Management and Economics, pp. 1377-1388.
6
Alshibani, A. (2008). Optimizing and controlling earthmoving operations using spatial technologies (Doctoral dissertation, Concordia University).
7
Amirkhanian, S. N., Baker, N. J. (1992). Expert system for equipment selection for earth-moving operations. Journal of Construction Engineering and Management, 118(2), pp. 318-331. 10.1061/(ASCE)0733-9364(1992)118:2(318)
8
Autodesk (2020). Digital Transformation: The Future of Connected Construction. Retrieved from http://constructioncloud.autodesk.com/rs/572-JSV-775/images/Autodesk-IDC-Digital%20Transformation_The-Future-of-Connected-Construction.pdf.
9
Barbosa, F., Woetzel, J., Mischke, J. (2017). Reinventing construction: A route of higher productivity. McKinsey Global Institute.
10
Fu, J., Jenelius, E., Koutsopoulos, H. N. (2017). Identification of workstations in earthwork operations from vehicle GPS data. Automation in Construction, 83, pp. 237-246. 10.1016/j.autcon.2017.08.023
11
Halpin, D. W., Woodhead, R. W. (1976). Design of construction and process operations. John Wiley & Sons, Inc..
12
Hola, B., Schabowicz, K. (2010). Estimation of earthworks execution time cost by means of artificial neural networks. Automation in Construction, 19(5), pp. 570-575 10.1016/j.autcon.2010.02.004
13
Im, M. S. (2021). Digital innovation strategies and future prospects in the construction Industry. Construction Engineering and Management, 22(1), pp. 13-18.
14
Jayawardane, A. K. W., Harris, F. C. (1990). Further development of integer programming in earthwork optimization. Journal of construction engineering and management, 116(1), pp. 18-34. 10.1061/(ASCE)0733-9364(1990)116:1(18)
15
Jeong, G. H., Kim, D. G. (2022). Hyundai Construction, digital transformation of construction industry and future. Construction Engineering and Management, 23(1), pp. 25-31.
16
Kamat, V. R., Martinez, J. C. (2001). Visualizing simulated construction operations in 3D. Journal of computing in civil engineering, 15(4), pp. 329-337. 10.1061/(ASCE)0887-3801(2001)15:4(329)
17
Kim, J., Chi, S. (2020). Multi-camera vision-based productivity monitoring of earthmoving operations. Automation in Construction, 112, p. 103121. 10.1016/j.autcon.2020.103121
18
Kirchbach, K., Aziz, Z. U. H., Tezel, B. A. (2015). Earthworks control automation.
19
Lee, H. J., Kwon, Y. M., Yoon, C. W., Seo, J. W. (2016). Productivity Analysis on Real-time Path Monitoring of Dumps. KSCE Journal of Civil and Environmental Engineering Research, 36(3), pp. 565-571. 10.12652/Ksce.2016.36.3.0565
20
Lewis, P., Hajji, A. (2012). Estimating the economic, energy, and environmental impact of earthwork activities. In Construction Research Congress 2012: Construction Challenges in a Flat World, pp. 1770-1779. 10.1061/9780784412329.178
21
Liu, L. Y., Ioannou, P. G. (1992). Graphical object-oriented discrete-event simulation system. In Proceedings of the 24th conference on Winter simulation, pp. 1285-1291. 10.1145/167293.167915
22
Li, H., Chen, Z., Yong, L., Kong, S. C. (2005). Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency. Automation in Construction, 14(3), pp. 323-331. 10.1016/j.autcon.2004.08.007
23
Li, H. X., Lei, Z. (2010). Implementation of Discrete-Event Simulation (DES) in estimating & analyzing CO 2 emission during earthwork of building construction engineering. In 2010 IEEE 17th International Conference on Industrial Engineering and Engineering Management, pp. 87-89. 10.1109/ICIEEM.2010.5646619
24
Lu, M. (2003). Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. 10.1061/(ASCE)0733-9364(2003)129:5(537)
25
Lu, M., Chan, W. H., Zhang, J. P., Cao, M. (2007). Generic process mapping and simulation methodology for integrating site layout and operations planning in construction. Journal of Computing in Civil Engineering, 21(6), pp. 453-462. 10.1061/(ASCE)0887-3801(2007)21:6(453)
26
Moselhi, O., Alshibani, A. (2009). Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. 10.1061/(ASCE)0733-9364(2009)135:10(948)
27
Montaser, A., Bakry, I., Alshibani, A., Moselhi, O. (2012). Estimating productivity of earthmoving operations using spatial technologies. Canadian Journal of Civil Engineering, 39(9), pp. 1072-1082. 10.1139/l2012-059
28
Nikas, A., Poulymenakou, A., Kriaris, P. (2007). Investigating antecedents and drivers affecting the adoption of collaboration technologies in the construction industry. Automation in construction, 16(5), pp. 632-641. 10.1016/j.autcon.2006.10.003
29
Pradhananga, N., Teizer, J. (2013). Automatic spatio-temporal analysis of construction site equipment operations using GPS data. Automation in Construction, 29, 107-122. 10.1016/j.autcon.2012.09.004
30
Sacks, R., Navon, R., Shapira, A., Brodetsky, I. (2003). Monitoring construction equipment for automated project performance control. NIST SPECIAL PUBLICATION SP, pp. 161-166. 10.22260/ISARC2002/0025
31
Shehadeh, A., Alshboul, O., Tatari, O., Alzubaidi, M. A., Salama, A. H. E. S. (2022). Selection of heavy machinery for earthwork activities: A multi-objective optimization approach using a genetic algorithm. Alexandria Engineering Journal, 61(10), pp. 7555-7569. 10.1016/j.aej.2022.01.010
32
Šopić, M., Vukomanović, M., Car-Pušić, D., Završki, I. (2021). Estimation of the excavator actual productivity at the construction site using video analysis. Organization, Technology and Management in Construction: an International Journal, 13(1), pp. 2341-2352. 10.2478/otmcj-2021-0003
Information
  • Publisher :Journal of KIBIM
  • Publisher(Ko) :한국BIM학회
  • Journal Title :Journal of KIBIM
  • Journal Title(Ko) :한국BIM학회논문집
  • Volume : 12
  • No :4
  • Pages :61-69
  • Received Date : 2022-09-07
  • Revised Date : 2022-10-12
  • Accepted Date : 2022-10-12